成本管理 | 降低工程施工成本的30個有效措施!

作者:
安徽新天源建設咨詢有限公司
最后修訂:
2020-05-18 09:30:23

摘要:

降低(di)施(shi)工項(xiang)目成本的途徑(jing)應該是(shi)既開源(yuan)又(you)節(jie)(jie)流或(huo)(huo)者說增(zeng)收(shou)又(you)節(jie)(jie)支(zhi),只(zhi)開源(yuan)不節(jie)(jie)流或(huo)(huo)者只(zhi)節(jie)(jie)流不開源(yuan)都不可能(neng)達到(dao)降低(di)成本的目的,至(zhi)少是(shi)不會有理(li)想(xiang)的效果。下面從增(zeng)收(shou)節(jie)(jie)支(zhi)的角(jiao)度(du)論述降低(di)施(shi)工項(xiang)目成本的途徑(jing)和措施(shi)。



降低(di)成(cheng)本的30個(ge)有效措施




1.加強工程(cheng)項目的成本管理,編制工程(cheng)成本控制計劃,增(zeng)收節支(zhi),定期進行成本分析,采取降(jiang)低費用開支(zhi)、增(zeng)加盈(ying)利。


2.編制科學合理的施工計劃。

項(xiang)目部(bu)根據(ju)工程總(zong)進(jin)(jin)度計劃及(ji)時編制安(an)裝(zhuang)工程分部(bu)施工進(jin)(jin)度計劃,充分采用(yong)交叉(cha)施工、流水作(zuo)業等(deng)手段,科學安(an)排施工的各(ge)要素,并嚴(yan)格落(luo)實,減少窩(wo)工、停工等(deng)現象,提高勞(lao)動生產率。


3.項(xiang)目部在(zai)滿足施工(gong)進度(du)(du)的(de)前(qian)提下,科學編(bian)制月、季度(du)(du)用料計(ji)劃;加強現場材料管理(li)工(gong)作,做到用料計(ji)劃準確無誤,按(an)工(gong)程進度(du)(du)需要,組(zu)織不(bu)同品(pin)種、規(gui)格的(de)材料分批進場。


材料、設備的采購要貨比(bi)三家(jia),最后確(que)定(ding)供貨單位,批(pi)量材料爭(zheng)取由廠家(jia)直(zhi)接供應(ying),以減少中間流通環(huan)節,降(jiang)低材料采購的成本。


進(jin)場的材(cai)料的設備要減少露天堆放的時間,防止自然損耗的丟失,減小保(bao)管費用。施工(gong)時做到限量領料,合理用料,降低(di)材(cai)料的損耗量。


4.采用散(san)裝水泥(ni),節省包裝費(fei)用。


5.盡量在原材料或半成品的產(chan)地完成質量驗收,減少材料報廢(fei)率等。


如(ru)花崗(gang)巖采(cai)購必須到(dao)礦山挑選母材。切(qie)割后(hou),在產地進行排板驗收(shou)合格后(hou)方能運至工地。


6.砼(tong)中采用(yong)雙摻技術,一方面(mian)可降低成本,二則也可以改善砼(tong)(砂漿)的(de)和易(yi)性提高砼(tong)的(de)質(zhi)量。


7.加(jia)強(qiang)勞動力的(de)調度與管(guan)理。


按工(gong)程(cheng)進度的(de)需要配(pei)備勞動(dong)力,對施工(gong)班組(zu)采取比較徹(che)底(di)的(de)責任承包辦法,工(gong)資分配(pei)同所完成的(de)工(gong)程(cheng)掛鉤,提倡(chang)一專多能(neng),減少間歇窩工(gong)及非生產用工(gong)。


8.施工機(ji)具配備要(yao)合(he)理,選用效率高(gao)(gao)的施工機(ji)械,提高(gao)(gao)生產率及機(ji)械化施工水平(ping)。


9.選用(yong)先進合理的施工(gong)(gong)(gong)工(gong)(gong)(gong)藝及施工(gong)(gong)(gong)方法,充分利(li)用(yong)施工(gong)(gong)(gong)場(chang)地,擴大拌制工(gong)(gong)(gong)作面,提高拌制加工(gong)(gong)(gong)效率,減少(shao)工(gong)(gong)(gong)程(cheng)費用(yong)。


10.加強對過(guo)程產(chan)品質(zhi)量的控制和管理,保證產(chan)品一次成(cheng)優,減少返工等現象,以(yi)質(zhi)量保進度,以(yi)質(zhi)量降成(cheng)本(ben)。


11.認真實施各(ge)項質量制度。


在(zai)施工(gong)過程(cheng)中,項目部(bu)應(ying)按(an)公司質(zhi)量(liang)(liang)手冊、程(cheng)序文件的要求確保質(zhi)量(liang)(liang)體系的有效運行,嚴把(ba)各項質(zhi)量(liang)(liang)檢驗關(guan),對衛生間、隱(yin)蔽(bi)工(gong)程(cheng)等重點(dian)部(bu)位加強監(jian)督檢查,將質(zhi)量(liang)(liang)隱(yin)患消除(chu)在(zai)萌芽狀(zhuang)態(tai),避免因質(zhi)量(liang)(liang)問題而造成(cheng)的整改、返工(gong)損(sun)失。


12.合理組織施(shi)工。


對安裝工(gong)程來說,工(gong)程前期(qi),施(shi)工(gong)配(pei)合工(gong)期(qi)長,耗工(gong)量(liang)大,后(hou)期(qi)工(gong)程量(liang)集中,工(gong)期(qi)緊(jin)、壓力(li)大,在施(shi)工(gong)安排上要及早采取相應的措施(shi),做到邊配(pei)合,邊加工(gong),有安裝條件(jian)的抓緊(jin)施(shi)工(gong),以分散施(shi)工(gong)高峰(feng)期(qi)的工(gong)作(zuo)量(liang),減輕工(gong)程后(hou)期(qi)對安裝工(gong)作(zuo)的壓力(li),做到均衡施(shi)工(gong)。


13.在施工(gong)(gong)(gong)過程中,積極推行(xing)新(xin)工(gong)(gong)(gong)藝、新(xin)材料、新(xin)機(ji)具等新(xin)的(de)施工(gong)(gong)(gong)方法(fa)手段,以提高施工(gong)(gong)(gong)效(xiao)率,降低工(gong)(gong)(gong)程費用(yong),注重技(ji)術革新(xin)和(he)合理化建議工(gong)(gong)(gong)作,以確保工(gong)(gong)(gong)程質量、進度及成本目標的(de)實現。


14.注重工程的(de)收尾及交付使用,保證及早(zao)發揮(hui)效益(yi)。


工(gong)(gong)程完工(gong)(gong)后,盡快拿出工(gong)(gong)程結算資(zi)料(liao),做到工(gong)(gong)完、場清(qing)、賬清(qing),使企業的(de)效(xiao)益及時得到體現,保證資(zi)金(jin)的(de)正常回籠,加快資(zi)金(jin)的(de)周(zhou)轉,降低財務費用。


15.充(chong)分把握圖紙會審關,使設(she)計方(fang)案結合(he)實際,降低(di)造價(jia),方(fang)便施(shi)工(gong)。


16.加強現場總平面管理(li),進(jin)場材(cai)料、成品、半成品要(yao)按場地布置圖堆放,做到合理(li)、整齊,以減少(shao)二次搬運損耗。


17.抓(zhua)材料的裝(zhuang)卸、運(yun)輸、管理各個環(huan)節,降低(di)物資(zi)消耗。


18.合理安排土方(fang)開挖(wa)程序(xu)。


調配土(tu)方開挖與回填,節約工程費用。在確保安全(quan)的前提下,減少基槽土(tu)方放坡(po),可減少土(tu)方量,從而(er)節約人工費及機械臺(tai)班(ban)費。


19.做(zuo)好材料計量工作,做(zuo)好落手(shou)清,合理回收(shou)利用減少原材料消耗。


20.加(jia)強模板管(guan)理,做好(hao)模板的拆模、維修工作(zuo),增(zeng)加(jia)周轉次(ci)數。


21.混(hun)凝土摻早強劑,縮短支模(mo)時(shi)間(jian),加快(kuai)模(mo)板周(zhou)轉。


22.做好材料(liao)進場驗收工作(zuo),驗質量(liang)、驗數量(liang),減(jian)少進場損耗。


23.加強(qiang)機(ji)(ji)械(xie)設備(bei)管理(li)、保(bao)養、維(wei)修,提高機(ji)(ji)械(xie)利用(yong)率。


24.提高(gao)計劃管理水(shui)平,抓(zhua)住計劃編(bian)制,綜合平衡和檢查執行環節(jie)。


加強生產(chan)管理(li)工(gong)作(zuo),及時(shi)解決施(shi)工(gong)過程中(zhong)的實際(ji)問(wen)題,以加快(kuai)施(shi)工(gong)進度。


25.要求以(yi)預算收入控(kong)制支出,進行成本核算,制定(ding)目標成本。


26.根(gen)據目標成本(ben),進行(xing)成本(ben)倒算,確定各部分項工(gong)程材料用量控制(zhi)范圍(wei)及各工(gong)種控制(zhi)范圍(wei)。實行(xing)成本(ben)否決權。


27.嚴格(ge)樣(yang)板開路(lu),減(jian)少(shao)返工,降(jiang)低(di)成(cheng)本。


28.加強(qiang)合同管理,降低合同風險。


29.降(jiang)低(di)物資(zi)采購(gou)成本。


30.降(jiang)低原材料(liao)成本。